LOWER ZAKUM- LONG TERM DEVELOPMENT PROJECT PHASE-1PACKAGE 6 – AL OMAIRAH ISLAND EARLY WORKS

Home/LOWER ZAKUM- LONG TERM DEVELOPMENT PROJECT PHASE-1PACKAGE 6 – AL OMAIRAH ISLAND EARLY WORKS
LOWER ZAKUM- LONG TERM DEVELOPMENT PROJECT PHASE-1PACKAGE 6 – AL OMAIRAH ISLAND EARLY WORKS
Project Description

Client: ADNOC
Location: LOWER ZAKUM
Year: 2025 – 2026 (18 Months) Ongoing

Scope:

  • The scope comprises of Carrying out the Engineering, Procurement, Construction, Pre-Commissioning, Commissioning & Start-up of the :
  • Drilling Flare System and Associated Facilities for commencement of drilling.
  • Civil Works: Foundations, trenches, 104 well cellars, pavements, chemical storage, pipe inspection sheds, and access roads.
  • Process & Utility Piping: Includes 15 pipelines from the harbour to the drill pad, seawater underground lines, propane and nitrogen bottle racks.
  • Electrical Systems: Power for the KOD pump, lighting across the island, sheds, and offshore structures.
  • Instrumentation & Telecom: Fire & Gas systems, and communication facilities for safe operations.
  • Temporary Accommodation: Self-supported camp for 470 personnel.